RECON roofing crew installing new architectural asphalt shingles on a steep roof at golden hour with the Rocky Mountains behind

HOAs · Multifamily · Commercial · Homes

When a Roof Is Done,
We Replace It Right.

Some roofs are genuinely finished. Hail-shredded fields, failed decking, chronic leaks, and roofs past the end of their life get replaced properly: correct underlayment and flashing details, real ventilation, photo-documented quality control, and a closeout package your insurer, your board, and your next buyer will all accept. Multi-building HOA and multifamily programs are phased by condition and budget year.

  • Honest condition assessment first
  • HOA and multifamily program scale
  • Insurance-ready documentation
Honest FirstWe confirm the roof is done before quoting a tear-off
DetailedFlashings, penetrations, ventilation — not just field shingles
DocumentedPhoto QC at every stage
Program ScaleSingle homes through multi-building community programs

HOA, Multifamily & Residential Roof Replacement

Most Roofs Fail
at the Details.

Field shingles are the easy part. Roofs leak at valleys, step flashing, chimneys, sidewalls, pipe boots, and skylight curbs — and they die early when the attic can't breathe. Anybody can nail on a shingle. We get paid for the parts you'll never see, and we photograph them so you know they were done.

Honest triage first

Every replacement conversation starts with an on-roof assessment. If the roof has serviceable life left, we'll tell you that in writing, with photos, and you keep your capital — even though the replacement is the bigger ticket for us. If it's done, we say so, and we show you why.

Execution standard

Tear-off to clean deck, decking repaired where it's soft, ice-and-water and underlayment per assembly, new flashings and boots instead of reused ones, correct nailing pattern, and intake and exhaust ventilation that actually balances. Magnetic sweep of the property before we leave.

Documentation you keep

Photos at tear-off, deck, dry-in, detail, and completion; materials and colors used; warranty registration; and a closeout package sized for an insurance file, an HOA reserve record, a lender, or a future sale.

How a Replacement Runs — Four Steps

  1. 01

    Assess

    On-roof inspection with photos: shingle condition, decking, flashings, ventilation, and leak evidence in the attic. You get a straight recommendation — repair, replace, or leave it alone — before anyone talks price.

  2. 02

    Scope & Materials

    Assembly specified line by line: underlayment, ice-and-water coverage, flashing details, vent components, shingle line and color, and how we'll protect landscaping, drives, and resident access. Insurance claims get a scope that matches the carrier's language.

  3. 03

    Tear-Off & Install

    Property protected, roof torn to deck, decking repairs documented, dry-in same day, then install with detail work done by hand where it matters. Most single-family roofs are a one to two day job; community programs run building by building on a published schedule.

  4. 04

    Inspect & Close Out

    Final walk with photo QC, magnetic sweep, gutters cleared of debris, warranty registration, and the closeout package delivered — per address on community programs, so the reserve file is complete.

Fit

Who This Is For

HOA & Multifamily Communities

Multi-building replacement programs sequenced by condition, with per-address documentation, resident communication, and phasing that spreads reserve spend across budget years — or drops straight out of a RECON PCA.

Commercial & Insurance Claims

Hail and wind claims where the scope needs to be documented properly and the repair needs to match what was actually approved. We work directly with adjusters and keep the property operating.

Homeowners

Roofs at the end of their life, storm damage, or a house going on the market that needs a defensible roof condition. One crew, documented, no subcontractor roulette.

Questions Owners Ask

How do I know I actually need a replacement?

You start with an assessment. Aging but sound shingles on intact decking usually have life left, and we'll say so. Failed decking, hail fractures across the field, or active leaks in multiple areas mean replacement. We show you the photos either way.

How long does a replacement take?

Most single-family roofs are torn off, dried in, and finished in one to two days. Larger or steeper roofs and community programs take longer, and you'll have the schedule before we start.

Do you work with insurance claims?

Yes. We document damage, provide scopes that align with carrier line items, and coordinate with your adjuster. We won't inflate a claim or promise to cover your deductible — that's fraud, and it's how contractors disappear mid-project.

Can you handle a whole HOA or multifamily community?

Yes. We phase multi-building programs by condition and budget year, deliver per-address documentation, and keep boards and residents informed throughout. If a RECON Property Condition Assessment already ranked the buildings, the phasing plan is the schedule.

Free Roof Assessment

Get the Honest
Answer First.

Tell us about the roof — or the community. We'll get on it, photograph real condition, and tell you plainly whether it has life left or whether replacement is the right call. You keep the photos and the report either way.

  • On-roof inspection, not a windshield estimate
  • Repair-versus-replace recommendation in writing
  • Insurance-ready documentation and adjuster coordination
  • Single homes through multi-building community programs
Service area
Arizona · Colorado · Florida — nationwide for select projects

Request a Roof Assessment

Please enter your name.

Please enter a valid email address.

Please enter a phone number we can reach you at.

Please choose a property type.

We respond within one business day. Your information is used only to schedule and prepare your visit.